


|
JOURNALS
· Pedro Leite Rocha, Martín Gómez Ravetti, Geraldo Robson Mateus, and Panos M. Pardalos. Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times. Computers & Operations Research (C&OR). v 35,n 4, pp. 1250-1264, April 2008.
· Martín Gómez Ravetti, Geraldo Robson Mateus, Pedro Leite Rocha and Panos M. Pardalos. Scheduling problem with unrelated parallel machines, sequence dependent setups, due dates and eligibility constraints. International Journal of Operational Research (IJOR), Vol. 2, No. 4, pp. 380 - 399, 2007.
· Mateus Rocha, Martín Gómez Ravetti, Geraldo Robson Mateus, and Panos M. Pardalos. Solving Parallel Machines Scheduling Problems with Sequence Dependent Setup Times Using Variable Neighborhood Search. IMA Journal of Management Mathematics (IMA-JMM). 18, pp. 101-115, 2007.
Submitted
· G.R. Mateus, M. G´omez Ravetti, M. Cardoso de Souza, Tas Valeriano and Marcos Magalhães. Capacitated Lot Sizing and Sequence Dependent Setup Scheduling: An Iterative Approach for Integration. Submitted for publication to Journal of Scheduling, 2007.
CONFERENCES
· M. Gómez Ravetti, Mauricio C. Souza, Tas Valeriano, Marcos Magalhes.Integrating Capacitated Lot Sizing and Sequence Dependent Setup Scheduling.In XXXIX Simpsio Brasileiro de Pesquisa Operacional, 2007, Fortaleza. Anais do XXXIX SBPO, 2007. v. 1.
· Luciana. P. Assis, M. G´omez Ravetti. Heur´ısticas Construtivas Aplicadas ao Problema de Roteamento de Veículos com Coleta e Entrega Simultˆaneas. In XXXIX Simpsio Brasileiro de Pesquisa Operacional, 2007, Fortaleza. Anais do XXXIX SBPO, 2007. v. 1.
· Mateus Rocha, Martín Gómez Ravetti, and Panos M. Pardalos. Abordagem Variable Neighborhood Search para o Problema de Seqüenciamento com Máquinas Paralelas e Tempos de Preparação Dependentes da Seqüência . In: Simpósio Brasileiro de Pesquisa Operacional, 2006, Goiânia - GO. Anais do XXXVIII SBPO. v. 38.
· Adriana A. Oliveira, Martín Gómez Ravetti, and Geraldo Robson Mateus. Traffic en-gineering in mpls networks: Ars an adaptive routing scheme based on control charts. In 23o Simpósio Brasileiro de Redes de Computadores - SBRC 2005, Fortaleza, Ceará, Brasil, 2005.
· Adriana A. Oliveira, Martín Gómez Ravetti, and Geraldo Robson Mateus. Using control charts for traffic change's detection in mpls networks. In Mascots, 2004, Volendam, Holanda, 2004 .(Poster).
· Pedro Leite Rocha, Martín Gómez Ravetti, and Geraldo Robson Mateus. The meta- heuristic grasp as an upper bound for a branch and bound algorithm in a scheduling problem with non-related parallel machines and sequence-dependent setup times. In EU/ME Workshop, Nottingham, Inglaterra, 2004.
· Martín Gómez Ravetti, Geraldo Robson Mateus, and Pedro Leite Rocha. Problema de sequenciamento com máquinas paralelas e tempos de preparação de máquinas dependentes de sequência. In XXXVI Simpósio Brasileiro de Pesquisa Operacional, (XXXVI SBPO), São João del Rei, 2004, Brasil, 2004.
· Martín Gómez Ravetti, Geraldo Robson Mateus, and Pedro Leite Rocha. Programación de tareas con máquinas paralelas no relacionadas, puestas a punto dependientes de la secuencia y restricciones de elegibilidad. In Congreso Latino-Iberoamericano de Investigación de Operaciones y Sistemas (CLAIO 2004), Havana, Cuba, 2004.
· Martín Gómez Ravetti and Geraldo Robson Mateus. Problemas de scheduling considerando máquinas paralelas y tiempos de preparación de máquinas dependientes de la secuencia. In Escuela Latinoamericana de Investigación Operativa (ELAVIO 2004), Montevideo, Uruguai, Feb 2004.
· Martín Gómez Ravetti and Geraldo Robson Mateus. Sequênciamento de tarefas com máquinas paralelas, permitindo atrasos e com tempos de preparação de máquina dependentes da sequência. In XXXV Simpósio Brasileiro de Pesquisa Operacional, (XXXV SBPO), Natal, Brasil, 2004.
Thesis
· M. Gómez Ravetti. Algorithms for a scheduling problem with parallel machines and sequence dependent setups. Doctoral dissertation, UFMG - Federal University of Minas Gerais, 2007.
· M. Gómez Ravetti. Problemas de sequenciamento com máquinas paralelas e tempos de Preparação dependentes da sequência. Master's thesis, UFMG - Federal University of Minas Gerais, 2003.
WORKING PAPERS
· Martín Gómez Ravetti, Rodrigo Soares, Mauricio G.C. Resende, Geraldo R. Mateus, and Panos M. Pardalos. Hybrid heuristic for the permutation flow shop problem.
· Michael J. Hirsch, Martín Gómez Ravetti, Claudio N. Meneses, and Panos M. Pardalos. Relationships between Problems in Discrete and Continuous Optimization. Working Paper, 2007.
|
|
publications |